tangierclinic.typepad.com > Clinic Construction

Drill rig approaching Tangier
Drill rig approaches Tangier Island
Drill rig moving through streets
Drill rig at site
Engineers prep to test soil
Construction site: digging the foundation
Construction site: digging the foundation.ll
Construction site: digging the foundation.lll
Construction site: pouring the foundation
Dr. Nichols sealing his mark in concrete for all eternity
Construction site: preparing the foundation
Construction site: preparing the foundation II
Construction site: preparing the foundation III
Construction site: preparing the foundation IV
Construction site: preparing the foundation V
Construction site: signing the "corner stone"
Long-time Tangier resident looking over site
Inez Pruitt, Tangier Clinic's local Physicians Assistant and her little one
Clinic foundation blocks assembled and ready to go
Clinic foundation blocks assembled and ready to go.2
Subfloor installed.12.2009
Foundation set.12.2009
Walls raised.12.2009
Trusses.01.2010
Roof trusses.01.2010
Framed clinic.01.2010
Under the trusses.01.2010
Exterior of frame-up clinic.01.2010
Interior of framing.01.2010
View from trusses over tangier.01.2010
DSC01498
Side elevation.March 2010
Interior.drywall.group.photo.April 2010
Insulation installed in attic space II
Insulation installed in attic space
Insulation in interior walls
Side view of clinic.April.2010
Dr.Nichols.Jimmie.other 5.10.10
Front view of clinic w. covered porch. 5.10.10
Dr.Nichols looking at plans.inside.II
Exterior siding view from front 5.10.10
Dr.Nichols looking at plans.inside
Interior room. 5.7.10
Rear view of clinic 5.7.10
Inez Dr. Nichols outside front of clinic 6.5.10
Dr. Nichols Inez interior hall 6.5.10
Interior office space 5.26.10